Covent Garden Project

  • Location: Covent Garden
  • Client: Workplace UK Limited
  • Duration: 8 Weeks
  • Cost: £50,000
  • Sector: Commercial
Covent Garden Project
Covent Garden Project
Covent Garden Project

Our Challenge

S&G were contracted by Workplace UK a central London office fit out specialist, to supply and install a comfort cooled and heated working environment to meet the client’s needs.

Our Solution

This involved the removal of the existing base build VAV system back to the risers, installing new Constant Volume boxes and primary air ductwork to provide fresh air ventilation to the Open Plan Offices, Cellular Offices and Meeting Rooms.

A new Toshiba Mini VRF System has been installed to supply cooled and heated air to the working areas, with individual controls for the office staff. The ducted units and associated secondary ductwork were installed and hidden above new ceiling rafts built in the office areas, so minimal services were on show at high level.

Our scope of works included the following:

  • VRF Air Conditioning Systems
  • Primary Air Modifications
  • Extract Ventilation Modifications