- Location: Barry
- Client: Kellaway Commercial
- Duration: 3 weeks
- Cost: Undisclosed
- Sector: Commercial






Our Challenge
We were employed directly by Kellaway Commercial to carry out the design and installation of the air conditioning systems on the First Floor of their new offices in Barry, South Wales.
Our Solution
To ensure the new office space had sufficient air conditioning installed to satisfy our calculated peak heat loads, we decided to install 6no new Midea split systems. Due to the size of the rooms we installed 6no compact cassettes to each room complete with its own individual hard wired remote controller.
The air conditioning system was fully tested and commissioned by ourselves, before providing a handover demonstration to the client.
Our scope of works included the following:
- Design
- Testing and Commissioning
- Client Demonstration